Pepco systems are designed to be fully automatic with built-in diagnostics
PEPCO systems are designed to be fully automatic with built-in diagnostics. The system equipment and software are configured for easy expansion, advanced communications options and predictive maintenance options. PEPCO provides complete documentation packages, replacing all existing schematics, wiring diagrams, junction box drawings, Operations Manuals, etc. The emphasis on off-the-shelf equipment selection, open system architecture and documentation makes the customer self-sufficient for future maintenance.
PEPCO Experience
>> The PEPCO Systems are proven, running over 4,000 Megawatts of gas turbine power.
>> Running - Control Houses, Sequencer Retrofits & Upgrades - Over 175 Pratt & Whitney Engines
Site/Project Description System Type
FT4-A9 Dual Fuel Twin Pac - Digital Fuel Controls
69kV Switchyard Dead Bus Re-Sync Control, Y2K Upgrade,
FT4-C3F Dual Fuel Power Pac - Complete Control House
Chester Station -- FT4-AS Liquid Fuel Power Pac (3)
Southwark Station -- FT4-AS Liquid Fuel Power Pac (3)
Eddystone Station -- FT4-AS/A6 Liquid Fuel Power Pac (4)
Barret Station -- FT4-A9 Dual Fuel Twin Power Pac
C3F Twin Pac (Quantum CPU - Symax lO) (Unit Updated & Moved from Ecuador)
C3F Power Pac (Quantum CPU - Symax IO) (Unit Updated & Moved From Ecuador).
Delaware Station -- FT4-A9 Liquid Fuel Power Pac (2)
Delaware Station -- FT4-AS Liquid Fuel Power Pac (2)
Moser Station -- FT4-A9 Liquid Fuel Power Pac (3)
Falls Station -- FT4-A9 Liquid Fuel Power Pac (3)
FT4-A9 Liquida Fuel Power Pac (2) - Digital Fuel Controls
Wood Group Pratt & Whitney - Conectiv
GG3 Worthington Liquid Fuel Power Pac (I) - Digital Fuel Control
FT4-C3F Dual Fuel Power Pac (Quantum CPU - Symax 110)
FT4-A9 Twin Pacs - Nox Abatement Water Injection (24 Engines)
Water Injection System, FT4-AS Power Pac (2)
FT4 Test Stand Control & Data Acquisition System - Digital Fuel Control
Schuylkill Station -- FT4-A9 Liquid Fuel Power Pac (2)
Bogue Station -- FT4-A9 Liquid Fuel Power Pac (3)
Bogue Station -- FT4-C3F Liquid Fuel Power Pac
GG3 Worthington --Dual Fuel Twin Pacs (S) - Power Augmentation Fog Systems
FT4-C1 & C1D Dual Fuel Twin Pacs (10) - Power Augmentation Fog Systems
Dickerson Station Power Pac (post - overspeed destruction)
Chula Vista Worthington Double Expander - DLN, FOG, New control building
Escondido Worthington Double Expander - DLN, FOG, New control building
Site/Project Description System Type
Six (6) Power Pac - SCADA WAN, fuel control, speed relay, ISO auto dispatch
Twin Pacs - Sequencer, fuel controls, AVR
Carls Corner - HPWI 2 Worthington Double Expander
Cedar Station - HPWI 1 Twin Pac, 1 Power Pac
Middle Station – HPWI 2 Power Pacs, 1 Worthington Double Expander
FT4 Test Stand Control & Data Acquisition System - Digital Fuel Control
Panoche site - Sequencer upgrade (Unit moved from Brownsville)
Vibration Monitor Upgrade (21 FT Power Pacs - Unit control upgrades listed above)
City-wide SCADA system Controlling six (6) generators and three (3) substations (Total of
70MW, a 50MW FT4 previously entered above)
Twin Pacs - Sequencer, fuel controls, AVR
Cos Cob, CT Five (5) Power Pac Seq, FC, SCADA, HPWI
Resited J Twin Pal<, J Power Pac, & I Mobile Pal<
Delaware City Fuel Control Upgrade (Existing PEPCO Digital Sequencer upgraded)
Under Construction Site/Project Description System Type
HWPI for five (5) CI Twin Pal<s (10 engines)
Barrett Station Unit II Twin Pal< Upgrade - Seq, FC
Edgemoor - (Existing PEPCO Digital Sequencer upgraded)
- Digital Sequencer Upgrade (all upgrades include a SCADA system and almost all include a new AVR and Auto synchronizer)
- High Pressure Water Injection System for NOx and Opacity reduction
SCADA - WAN system with monitoring and/or remote control (some systems have auto dispatch from ISO)
- AVR (Automatic Voltage Regulator) only upgrade
LetterHyperbaric Oxygen Therapy for Late Rectal and Bladder Toxicity after Radiation inProstate Cancer Patients. A Symptom Control and Quality-of-life StudySir d Radiation therapy achieves a high level of diseaseof them: physical functioning, role physical, social func-control and cure rates for organ-confined prostate cancertioning, role emotional and mental health. but a 5e20% incidenc